Tools › Roads

Signal timing by the Webster method

Enter the critical movement volumes for each phase and the saturation flow to get the optimum cycle length, the green split, the delay and an approximate level of service.

An assistive tool for preliminary design and learning. Review the results; final design and approval remain the responsibility of the licensed engineer of record.

Related tools